Now that the framing is almost complete
and the roof is almost sheeted . . .
It will be time to get crackin' over at
the new digs!!
1. The patio is going up.
2. The roof is going to get dried in.
3. The tiles are going to get stacked
on the roof.
4. The electrical is almost complete.
5. The inside plumbing is getting
installed.
6. The insulation will take place.
7. Sheetrock will begin.
8. Lath and plaster will start
on the outside.
We are getting to the exciting stage.
We will have some ACTION.
No comments:
Post a Comment